top of page

Beaver Ridge wind farm, Freedom, Maine. Maine’s 2nd wind farm, built in 2008. Three 1.5 mW generators; 262 ft tall towers, 122 ft blades, 15 rpm, tip speed 130 mph. 

197 Beaver Ridge

$395.00Price
Quantity
  • Prints are 24" W x 13.5" H. Dye sublimation metal print. Satin finish. Exhibit mount: aluminum sheet has styrene laminate backing and 3/4" inset frame. Ready to hang by pre-leveled French cleat or by picture hook.


     

    Contact by phone or email for custom sizes or mountings.

  • Shipping and handling to your address. $30

© 2016 by Jon Linn. Proudly created with Wix.com

  • Facebook Basic Black
  • Twitter Basic Black
  • Black Instagram Icon
bottom of page